New construction of a 107,000-square-foot, temperature-controlled building on state-owned land at the International Marine Terminal in Portland, ME. The Connection Engineering team at REX provided engineering calculations and shop drawing review for structural steel shear connections in the Maine International Cold Storage Facility.